Madam,
I refer to your e-mail of 25 February and please find below the answers to your questions:
On the use of bicycles within the municipality, although the actions community, for the use of bicycles, are not formalized in the form of an action plan bike, it is envisaged in the objectives of the future political mandate to pursue the action today implemented through the development of the pedestrian network cycles. These measures will fully integrate with a future Cycling Action Plan could be achieved for the year 2008/2009.
To this end, several actions are taken today to strengthen existing links pedestrians cycles and create new ones. These specific arrangements aimed primarily at increasing the efficiency of inter-district routes sweet as well as major employment centers in the municipality. As examples:
- studies requalification Avenue Jean Jaures foreshadow the creation of a pedestrian alley cons cycles between the station-Lieusaint Moissy and downtown;
- study being conducted by the pole SAN Sénart in partnership with the firm EGIS Development, pays particular attention to the integration of soft modes near the station (local bike secure and sheltered bicycle access configuration ...)
- area Arvigny activity must be inspected by the EPA SENART, options development on the streets Denis Papin and Louis de Broglie to enhance pedestrian cycle tracks;
- the right attitude for the future frontage road north of Moissy-Cramayel has been configured to perform throughout its route a pedestrian trail cycles full;
- any cancellation of a rural road due to new development or urbanization is systematically creating an alternative path: the disappearance of CV03 and CR1 and creating a pedestrian trail on the hills franciliennes cycles (4 km long) and a trail downstream substitution Park Chanteloup RD57 and connecting the northeast area of agglomerated Moissy-Cramayel ...
Moreover, taking into account the areas of service pedestrian cycles is now automatically integrated development operations undertaken by the public Planning Sénart. As such:
- the recent BIA Jatteau has enabled the creation of special routes accessible to bicycles on these main areas.
- future proposed business parks and the Ecopôle Park on the A5 also incorporate Secure axes modes and intended solely for pedestrians cycles.
However, to strengthen community action on the transverse axes who deserve it, the municipality prioritizes such development on areas of structural connections, or between neighborhoods, especially when the extra width of the roadway allows this type of development.
Indeed, each type of road does not necessarily require a specific pedestrian planning cycles. For example, the three-year contract for 2007-2009 is based on road tertiary roads where traffic does not necessarily require a specific pedestrian planning cycles. For example, the three-year contract relies Road 2007-2009 tertiary roads on which traffic does not necessarily need a development bike specific. He is wanted as often as possible, a dissociation between the modes car and bike to avoid the highest shares of the same tread, so accident-prone paths.
Finally, several solutions are constantly sought to improve conditions for bicycle parking: reflections begun on the installation of bike shelters in the city center (Place Memorial Hall Municipal Police ), pole-Moissy Lieusaint station, communal facilities, taking into account the approach sustainable development plan to be launched by the municipality in 2008-2009 ...
In addition, road improvements take into account this particular problem through Road Safety Committees to ensure the relevance of projects and their consistency with the soft modes of traffic. This area of progress has been reinforced in 2007 by creating a local commission accessibility.
The developer public of the new town is always aware of this problem as part of programming studies of new urban areas.
The planning documents SCOT, PLU, ZAC ... are increasingly attentive to this issue. Thus, the new PLU-Moissy Cramayel, approved on 17 December 2007, has strengthened several regulatory measures to the obligation to create local bike in the family housing operations, and create sheltered parking for bikes facilities and businesses.
It may, however, in the context of developing future action plan u bike, be considered to reorganize a number of control procedures, and strengthen the procedures for consultation with various partners and users.
Finally, concerning the links between municipalities, the San Sénart has depujs 1999 of a master plan links sweet. As such, some thirty miles of soft inter-linkages has been achieved. Other are now underway or planned, including the path of the Blackbirds (Nandy), the connection to the Square along the RD402.
In any event, it is desired consistency with the actions of the common (this is all a network of approximately 180km of routes across soft our territory). Similarly, the recent master plan for bicycle routes Department resumed our own scheme. In addition, work with the EPA Sénart allows the creation of these links in new development projects urban areas as they relate to housing or business parks. For example, the ratio on the Square is 22km of footpaths / cycle for 11km road.
For 2008, the San is revising its master plan. The goal is to continue building connections themselves, but also to develop equipment to promote cycling in commuting. For this, various actions are initiated or in progress. These are:
- a study and implementation of signage and police staked links sweet
- of setting implementation of appropriate parking, particularly in the vicinity of the RER,
- the establishment of a bike station (80 seats) station Lieusaint Moissy-in Encourages the European project, it is a system of secure parking (Electronic badge access) bike (especially for people going to the station by bicycle), coupled to a system of long-term bike rental (especially for employees arriving by train and working Sénart). A maintenance-repair system to the application will complement this scheme. This pilot project, if successful, to be duplicated on the other 3 RER Sénart.
remain at your disposal for any further information,
Sincerely.
Jean-Jacques FOURNIER